Adding Shift Information to Graph Reports

If a graph of utilization on a shift basis is required it will be necessary to produce a different type of graph. Normally this can be done by copying an existing graph and modifying it.

Go to the main Graphs/Graphs menu, select the graph we have just created and click the COPY button.


Edit the Description and Title to indicate this will be per Shift graph Go to the Period menu and edit the interval length to '1 Shift' and edit the Interval Title to $INTERVALSTARTTIMEHM - $INTERVALENDTIMEHM


The resulting graph should look like the following.


With a separate set of columns for each shift (we are running a two shift system in this example).